Dore & Whittier Study

  1. Introduction and Background
  2. Summary of Findings
    1. Executive Summary
    2. Summary of Findings - Site and Building Assessment
  3. Existing Building Basic Data
    1. Executive Summary
    2. Orthophotos of existing sites (HHS, HMS, Cedar)
    3. Orthophotos of existing sites (Center/Sylvester)
    4. High School Existing Floor Plans
  4. Hanover High School
    1. Site Assessment
    2. Architectural Assessment
    3. Hazardous Materials Assessment
    4. Structural Assessment
    5. HVAC Systems Assessment
    6. Electrical Systems Assessment
    7. Plumbing Assessment
    8. Technology Assessment
  5. Sylvester Elementary School
    1. Site Assessment
    2. Architectural Assessment
    3. Building Code Analysis
    4. Hazardous Materials Assessment
    5. HVAC Systems Assessment
    6. Electrical Systems Assessment
    7. Plumbing Assessment
    8. Technology Assessment
  6. Salmond School
    1. Site Assessment
    2. Architectural Assessment
    3. Hazardous Materials Assessment
    4. Structural Assessment
    5. HVAC Systems Assessment
    6. Electrical Systems Assessment
    7. Plumbing Assessment
  7. Curtis School
    1. Site Assessment
    2. Architectural Assessment
    3. Hazardous Materials Assessment
    4. Structural Assessment
    5. HVAC Systems Assessment
    6. Electrical Systems Assessment
    7. Plumbing Assessment
  8. Educational Programming
    1. Enrollment Projections and Related Data
    2. Educational Specifications
    3. Initial Drafts by Dr. Frank Locker
    4. Sylvester Elementary School
      1. Stand Alone School
      2. Center School Annex
      3. Center School Addition (selected option)
    5. Hanover High School
      1. Renovation/Addition to High School
      2. New Hanover High School
    6. SBA Form 645-4 Inventory of Existing Space - Sylvester Elementary School
    7. SBA Form 645-4 Inventory of Existing Space - Hanover High School
  9. Review of Options
    1. Options with Concept Sketches
    2. Preliminary Estimates
    3. Selected Options
  10. Appendix
    1. Sampling of Faculty and Staff Questionnaire presented by Dr. Frank Locker, 2 January 2002.
    2. Letter to DOE (SBA), 1 April 2002 from D&W on behalf of the School Building Needs Committee.
    3. Preliminary Geotechnical Study, by GSI dated April 5 2002.
    4. New England Association of Schools and Colleges Evaluation Report.
    5. Hanover High School Building Needs, Oct 2001.
    6. Questions and Answers from Dr. Pregot to Hanover School Committee and Hanover School Building Needs Committee. Oct 2001.
    7. Population Study, Town of Hanover, Analysis and Projections 1970 to 2020 by the Hanover Planning Board, prepared July 1993.
    8. Historical Data and Articles on Sylvester, Salmond and Curtis Schools.
    9. Habeeb & Associates, Draft Capital Asset Assessment dated December 15 1999.